|
|
|
| |
|
|
GEM Manufacturing
GEM Manufacturing, Athlone Road, Longford, Co Longford |
| |
|
|
|
|
Client |
GEM Manufacturing |
Duration |
2 months |
|
Main Contractor |
GEM Construction |
Architect |
N/A |
|
|
Value |
€0.7 million |
Sector |
Commercial/Industrial
|
|
Upgrade the existing dust extraction system with a view to use waste to generate heating to GEM Units 1, 2 & 3.
- From various meetings with specialised companies it was decided to go with WoodWaste Control who could provide all that was being sought plus they could offer a system that could filter the hot air that was being circulated
- The new system replaced 4nr. existing extractor cyclones with 1nr. central cyclone c/w overhead stainless steel ducting & fans plus 1nr. cyclone filter & 2 million BTU hot water boiler c/w water pumps etc.
- GEM Construction provided a new ESB sub-station, concrete base 13m x 12m plus 1m deep of concrete, structural steel & cladding surround to boiler & pump house.
|
| |
|
|
|
|
 |
Head Office:
Athlone Road,
Longford,
Co. Longford
T: +353 43 3345217
F: +353 43 3341854
E: info@gemgroup.ie |
Dublin Office:
Unit 2 Block 4B,
Blanchardstown
Corporate Park, Dublin 15
T: +353 1 8850432
F: +353 1 8850496
E: info@gemgroup.ie |
UK Office:
Mere House, Brook Street,
Knutsford, Cheshire,
WA16 8GP
T: +44 1565 752412
F: +44 1565 752121
E: info@gemgroup.co.uk |
|